Hilton delivered 2 x new vehicles to the tram operating company of Cologne. Both vehicles were built on a MAN TGM 4x2 chassis with hydrostatic driven road-rail system. The superstructure consists of a box body with loading platform at the rear. The rescue vehicle has been fully equipped with equipment lockers for the rescue equipment. The rescue equipment can be operated via the hydraulic system and the hydraulic generator on the truck. The box body for the welding equipment has also been fully equipped with heavy duty lockers and a special welding generator. Please contact our sales department for further information.